Skip to content
VR Patil Vividh VidyuthNirman Private LimitedSince 1985

143Sub-station · 143 of 163

2 x 100 MVA 220/110/11 kVsub-station at Shiggaon (Ganjigatti)

A bay with its marshalling kiosk, isolators behind and a cut rock face beyond
Voltage
220 kV
Client
KPTCL
Location
Shiggaon (Ganjigatti), Shiggaon Taluk
District
Haveri
Status
Completed

Scope of work.

“1. Establishing 2X100MVA, 220/110/11kV sub-station at Shiggaon (Ganjigatti) in Shiggaon taluk, Haveri district 2. Construction of 3.077km of 220kV MC (DC LILO) Line from 220kV Narendra-Haveri DC line to proposed 220/110kV sub-station at Shiggaon. 3. Construction of 0.582km of 110kV DC (SC LILO) line from proposed 220kV Shiggaon sub-station to 110kV Shiggaon-Savanur SC line in Haveri District. 4. Construction of 4.362km of 110kV DC (SC LILO) line from proposed 220kV Shiggaon sub-station to 110kV Ramanakoppa-Mundagod SC line in Haveri District”

Scope items

  • 012 x 100 MVA, 220/110/11 kV sub-station
  • 023.077 km of 220 kV M/C (D/C LILO) line from the Narendra–Haveri 220 kV D/C line
  • 030.582 km of 110 kV D/C (S/C LILO) line to the Shiggaon–Savanur 110 kV line
  • 044.362 km of 110 kV D/C (S/C LILO) line to the Ramanakoppa–Mundagod 110 kV line
Category
Sub-station
Voltage class
220 kV
Configuration
220/110/11 kV
Client
KPTCL
Location
Shiggaon (Ganjigatti), Shiggaon Taluk
District
Haveri
Status
Completed
Financial year
2022-23 & 2023-24
Tags
lilo
Bays in rows across the yard
The yard, with the control building and its lighting mast

Shiggaon (Ganjigatti), Shiggaon Taluk

The location named in the record could not be geocoded, so this project is not placed on the map.

Coordinates

—

Precision

—

Haveri district, Haveri — 1 project, district-level position