2 x 5 MVA 33/11 kV sub-station at Gunda

- 33 kV
- —
- Gunda, Sindhanoor Taluk
- Raichur
- Completed
Scope of work.
“Establishing 2X 5MVA, 33/11kV Sub-station at Gunda in Sindhanoor Tq & Raichur Dist and construction of 33KV S/C line using 9.5mtr RCC poles with Coyote ACSR Conductor from existing 33kV S/C line tapping from Turbinal to Tavaragera line to Proposed sub-station at Gunda on Total Turnkey basis”
- 2 x 5 MVA, 33/11 kV sub-station
- 33 kV S/C line on 9.5 m RCC poles with Coyote ACSR conductor
- Tapped from the Turbinal–Tavaragera 33 kV line
- Sub-station
- 33 kV
- 33/11 kV
- Not stated
- Gunda, Sindhanoor Taluk
- Raichur
- Completed
- 2019-20


Gunda, Sindhanoor Taluk
The location named in the record could not be geocoded, so this project is not placed on the map.
—
—
Raichur district, Raichur — 14 projects, 2 under execution, district-level position