2 x 100 MVA 220/110/11 kVsub-station at Gangavathi (Sulekal)

A sub-station switchyard from the air, a transmission tower beyond
Voltage
220 kV
Client
KPTCL
Location
Gangavathi (Sulekal), Gangavathi Taluk
District
Koppal
Status
Completed

Scope of work.

“1) Establishing 2x100MVA, 220/110/11kV Sub-station at Gangavathi (Sulekal) in Gangavathi Taluk, Koppal District.2) LILO of existing 220kV SC Lingapur-Kushtagi and 220kV Lingapur-Sindhanur lines to the proposed 220/110/11kV Gangavathi (Sulekal) Sub-Station for a distance of 13.755Km And3) Construction of 110kV SC line on DC towers from proposed 220/110/11kV Gangavathi (Sulekal) Sub Station to 110/33/11kV Kanakagiri Sub Station for a distance of 5.635Km.4) Construction of One number of 110kV Terminal Bay at existing 110/33/11kV Kanakagiri Sub Station for the proposed 110kV SC line on DC towers to the proposed 220/110/11kV Gangavathi (Sulekal) Sub Station in Gangavathi Taluk, Koppal District.5) LILO of existing 110kV Munirabad-Sindhanur lines 1 & 2 to the proposed 220/110/11kV Gangavathi (sulekal) Sub-station to link Gangavathi-Sreeramnagar on 1st circuit and 110kV Kampli-KPCL Pump House (Maralihalla) on the 2nd circuit for a distance of 17.733 Km.6) Construction of 110kV SC line on DC towers from proposed 220/110/11kV Gangavathi (Sulekal) Sub Station to 110/33/11kV Ta5varagere Sub Station for a distance of 26.871Km.7) Construction of One number of 110kV Terminal Bay at existing 110/33/11kV Tavaragere Sub Station for the proposed 110kV SC line on DC towers to the proposed 220/110/11kV Gangavathi (Sulekal) Sub Station in Gangavathi Taluk, Koppal District”

Scope items

  • 012 x 100 MVA, 220/110/11 kV sub-station
  • 02LILO of the 220 kV Lingapur–Kushtagi and Lingapur–Sindhanur lines, 13.755 km
  • 03110 kV S/C line on D/C towers to the 110/33/11 kV Kanakagiri sub-station, 5.635 km
  • 04110 kV terminal bay at the Kanakagiri sub-station
  • 05LILO of the 110 kV Munirabad–Sindhanur lines 1 and 2, 17.733 km
  • 06110 kV S/C line on D/C towers to the 110/33/11 kV Tavaragere sub-station, 26.871 km
  • 07110 kV terminal bay at the Tavaragere sub-station
Category
Sub-station
Voltage class
220 kV
Configuration
220/110/11 kV
Client
KPTCL
Location
Gangavathi (Sulekal), Gangavathi Taluk
District
Koppal
Status
Completed
Financial year
2021-22 & 2022-23
Tags
lilo
Bays across the yard, the control building beyond
Gantries and bays over the finished yard

Gangavathi (Sulekal), Gangavathi Taluk

The location named in the record could not be geocoded, so this project is not placed on the map.